{"id":66924,"date":"2021-10-28T03:20:03","date_gmt":"2021-10-28T03:20:03","guid":{"rendered":"https:\/\/papersspot.com\/blog\/2021\/10\/28\/maintenance-program-development\/"},"modified":"2021-10-28T03:20:03","modified_gmt":"2021-10-28T03:20:03","slug":"maintenance-program-development","status":"publish","type":"post","link":"https:\/\/papersspot.com\/blog\/2021\/10\/28\/maintenance-program-development\/","title":{"rendered":"Maintenance Program Development"},"content":{"rendered":"<p>This includes reliability and safety, maintenance costs, and the technical skills needed to conduct maintenance, now and in the future.\u00a0 While the FAA provides general guidance on the requirements of an effective maintenance program, the air carrier (and in turn the maintenance manager) is responsible for the successful implementation of these elements into the maintenance program itself. The key elements that fall under this responsibility are listed below. Using the information presented in Chapter 6 of the text, select 3 of the below elements and write a 2-3 page paper that discusses how those elements contribute to an effective maintenance plan. Airworthiness responsibilityAir carrier maintenance manualAri carrier maintenance organizationMaintenance record keeping systemAccomplishment and approval of maintenance and alterationsMaintenance scheduleRequired inspection itemsContract maintenancePersonnel trainingContinuous analysis and surveillance system (CASS)The paper must include the organizational sections listed below.Maintenance Plan Section RequirementsTitle PageAbstractBody (2-3 pages)Reference PageUtilize the most current version of APA format for guidance in formatting the paper, including all required in-text citations\/references.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>This includes reliability and safety, maintenance costs, and the technical skills needed to conduct maintenance, now and in the future.\u00a0 While the FAA provides general guidance on the requirements of an effective maintenance program, the air carrier (and in turn the maintenance manager) is responsible for the successful implementation of these elements into the maintenance [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[10],"class_list":["post-66924","post","type-post","status-publish","format-standard","hentry","category-research-paper-writing","tag-writing"],"_links":{"self":[{"href":"https:\/\/papersspot.com\/blog\/wp-json\/wp\/v2\/posts\/66924","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/papersspot.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/papersspot.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/papersspot.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/papersspot.com\/blog\/wp-json\/wp\/v2\/comments?post=66924"}],"version-history":[{"count":0,"href":"https:\/\/papersspot.com\/blog\/wp-json\/wp\/v2\/posts\/66924\/revisions"}],"wp:attachment":[{"href":"https:\/\/papersspot.com\/blog\/wp-json\/wp\/v2\/media?parent=66924"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/papersspot.com\/blog\/wp-json\/wp\/v2\/categories?post=66924"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/papersspot.com\/blog\/wp-json\/wp\/v2\/tags?post=66924"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}