{"id":78387,"date":"2021-12-01T11:14:24","date_gmt":"2021-12-01T11:14:24","guid":{"rendered":"https:\/\/papersspot.com\/blog\/2021\/12\/01\/running-head-project-1-running-head-project-1-renovation-of-exiting-bedroom\/"},"modified":"2021-12-01T11:14:24","modified_gmt":"2021-12-01T11:14:24","slug":"running-head-project-1-running-head-project-1-renovation-of-exiting-bedroom","status":"publish","type":"post","link":"https:\/\/papersspot.com\/blog\/2021\/12\/01\/running-head-project-1-running-head-project-1-renovation-of-exiting-bedroom\/","title":{"rendered":"Running head: PROJECT 1 Running head: PROJECT 1 Renovation of Exiting Bedroom"},"content":{"rendered":"<p>Running head: PROJECT 1<\/p>\n<p> Running head: PROJECT 1<\/p>\n<p> Renovation of Exiting Bedroom and Developing a Home Office<\/p>\n<p> Student\u2019s Name<\/p>\n<p> Institutional Affiliations<\/p>\n<p> Course<\/p>\n<p> Date<\/p>\n<p> Renovation of Exiting Bedroom and Developing a Home Office<\/p>\n<p> The project is about renovating an existing bedroom and developing a home office. The scope of the project will include:<\/p>\n<p> General preparation involving the purchase of all required materials.<\/p>\n<p> Demolition <\/p>\n<p> Structural work, including new flooring, trim work, and wall painting.<\/p>\n<p> Interior finishing.<\/p>\n<p> Electrical wiring, Internet, and computer connectivity.<\/p>\n<p> Procurement of office equipment and furniture.<\/p>\n<p> Fixing new washroom.<\/p>\n<p> The projected is estimated to cost $10500 and should take a timeframe of three weeks.<\/p>\n<p> Hierarchical Organizational Chart<\/p>\n<p> Team Leader 1<\/p>\n<p> Team Leader 1<\/p>\n<p> Team Leader 2<\/p>\n<p> Team Leader 2<\/p>\n<p> Contractor<\/p>\n<p> Contractor<\/p>\n<p> Construction Manager<\/p>\n<p> Construction Manager<\/p>\n<p> Architect<\/p>\n<p> Architect<\/p>\n<p> Project Manager<\/p>\n<p> Project Manager<\/p>\n<p> Owner<\/p>\n<p> Owner<\/p>\n<p> Activity List<\/p>\n<p> ID<\/p>\n<p> Activity<\/p>\n<p> Description <\/p>\n<p> A1<\/p>\n<p> Project preparation<\/p>\n<p> This activity will involve selecting a contractor, budgeting and procuring the materials that will be used, and arranging everything ready for the renovation project. Procuring office furniture and other supplies will also be considered here.<\/p>\n<p> A2<\/p>\n<p> Demolition and Restructuring<\/p>\n<p> Some structures within the bedroom that don&#8217;t fit the office layout will be demolished. After that, the engineers will restructure the layout of the room to fit the owner&#8217;s requirements. Engineers will evaluate the space from a functional standpoint and fix everything to meet the office standards.<\/p>\n<p> A3<\/p>\n<p> Wiring and Plumbing<\/p>\n<p> Electricians will fix the electrical cables in the walls. On the other hand, Plumbers will fix the water and sewage system within the room as the renovation continues.<\/p>\n<p> A4<\/p>\n<p> Flooring, Painting, wallpapering, and interior design.<\/p>\n<p> Once the walls are fixed, the engineers will plaster the floor and fix the tiles. Painters will paint the walls and decorate the room with wallpapers. The Interior designer will then fix the interior finishing of the room.<\/p>\n<p> A5<\/p>\n<p> Finishing touches<\/p>\n<p> Installation of Internet connectivity in the room and Furnishing the room to resemble a real office.<\/p>\n<p> Stakeholders Register<\/p>\n<p> Name <\/p>\n<p> position<\/p>\n<p> Role<\/p>\n<p> Contact Information<\/p>\n<p> Requirements<\/p>\n<p> Expectations<\/p>\n<p> Influence<\/p>\n<p> Classification<\/p>\n<p> Miek J.<\/p>\n<p> Project Sponsor<\/p>\n<p> Financier <\/p>\n<p> +61 5673540020<\/p>\n<p> Provide finances <\/p>\n<p> Project to be accomplished<\/p>\n<p> Initiator of the project<\/p>\n<p> owner<\/p>\n<p> Tob. C.<\/p>\n<p> Construction Manager<\/p>\n<p> Overseeing the project<\/p>\n<p> +61 9876541320<\/p>\n<p> Supervise the construction process<\/p>\n<p> Project to be delivered within the budget<\/p>\n<p> Control the entire project<\/p>\n<p> Internal<\/p>\n<p> Does G.I.<\/p>\n<p> Architect<\/p>\n<p> Designing the outlook of the room<\/p>\n<p> +61 8975463412<\/p>\n<p> To provide the design of the office<\/p>\n<p> Final outlay to resemble the drawn design<\/p>\n<p> Project designer<\/p>\n<p> External<\/p>\n<p> Shiv M.<\/p>\n<p> Project Manager<\/p>\n<p> Supervising the teams<\/p>\n<p> +61 9874563218<\/p>\n<p> Managing the entire process<\/p>\n<p> Project to progress effectively<\/p>\n<p> Supervisor<\/p>\n<p> Internal<\/p>\n<p> Chris K.<\/p>\n<p> Procurement Officer<\/p>\n<p> Procuring all materials<\/p>\n<p> +61 2587896543<\/p>\n<p> All materials are procured <\/p>\n<p> To procure all necessary resources required<\/p>\n<p> Procurement<\/p>\n<p> Internal<\/p>\n<p> Resource Breakdown Structure<\/p>\n<p> Project Resources<\/p>\n<p> Project Resources<\/p>\n<p> Electrical Engineers<\/p>\n<p> Electrical Engineers<\/p>\n<p> Building Engineers <\/p>\n<p> Building Engineers <\/p>\n<p> Project Management<\/p>\n<p> Project Management<\/p>\n<p> Engineers <\/p>\n<p> Engineers <\/p>\n<p> Designers<\/p>\n<p> Designers<\/p>\n<p> Junior Engineer<\/p>\n<p> Junior Engineer<\/p>\n<p> Senior Engineer<\/p>\n<p> Senior Engineer<\/p>\n<p> Junior Engineer<\/p>\n<p> Junior Engineer<\/p>\n<p> Construction Crew<\/p>\n<p> Construction Crew<\/p>\n<p> Senior Engineer<\/p>\n<p> Senior Engineer<\/p>\n<p> IT Experts<\/p>\n<p> IT Experts<\/p>\n<p> Equipment<\/p>\n<p> Equipment<\/p>\n<p> Office supplies<\/p>\n<p> Office supplies<\/p>\n<p> Human Resources<\/p>\n<p> Human Resources<\/p>\n<p> Materials <\/p>\n<p> Materials <\/p>\n<p> Bottom-up Estimation<\/p>\n<p> Labor<\/p>\n<p> Hours worked<\/p>\n<p> Rate per hour<\/p>\n<p> Total labor<\/p>\n<p> Project Manager<\/p>\n<p> 75<\/p>\n<p> $25<\/p>\n<p> $1,875<\/p>\n<p> Architect<\/p>\n<p> 3<\/p>\n<p> $50<\/p>\n<p> $150<\/p>\n<p> Building Engineer<\/p>\n<p> 72<\/p>\n<p> $15<\/p>\n<p> $1080<\/p>\n<p> Electrical Engineer<\/p>\n<p> 20<\/p>\n<p> $20<\/p>\n<p> $400<\/p>\n<p> Other laborers<\/p>\n<p> 300<\/p>\n<p> $10<\/p>\n<p> $3000<\/p>\n<p> Total labor<\/p>\n<p> $6505<\/p>\n<p> Physical Resources<\/p>\n<p> Amount<\/p>\n<p> Total<\/p>\n<p> Cement<\/p>\n<p> $150<\/p>\n<p> $150<\/p>\n<p> Paints\/ Wallpapers<\/p>\n<p> $240<\/p>\n<p> $240<\/p>\n<p> Tiles<\/p>\n<p> $370<\/p>\n<p> $370<\/p>\n<p> Electrical and Internet Cables <\/p>\n<p> $200<\/p>\n<p> $200<\/p>\n<p> Office Furniture<\/p>\n<p> $840<\/p>\n<p> $840<\/p>\n<p> Internal Decorations<\/p>\n<p> $650<\/p>\n<p> $650<\/p>\n<p> Other Resources<\/p>\n<p> $1200<\/p>\n<p> $1200<\/p>\n<p> Total<\/p>\n<p> $3650<\/p>\n<p> Bottom-Up Estimation<\/p>\n<p> $10,155<\/p>\n<p> References<\/p>\n<p> Forman, J. B. &amp; Discenza, R. (2012). Got stake?: (Holder) management in your project. Paper presented at PMI\u00ae Global Congress 2012\u2014North America, Vancouver, British Columbia, Canada. Newtown Square, PA: Project Management Institute.<\/p>\n<p> Rad, P. F., &amp; Cioffi, D. F. (2004). Work and resource breakdown structures for formalized bottom-up estimating.\u00a0COST ENGINEERING-ANN ARBOR THEN MORGANTOWN-,\u00a046(2), 31-37.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Running head: PROJECT 1 Running head: PROJECT 1 Renovation of Exiting Bedroom and Developing a Home Office Student\u2019s Name Institutional Affiliations Course Date Renovation of Exiting Bedroom and Developing a Home Office The project is about renovating an existing bedroom and developing a home office. The scope of the project will include: General preparation involving [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[10],"class_list":["post-78387","post","type-post","status-publish","format-standard","hentry","category-research-paper-writing","tag-writing"],"_links":{"self":[{"href":"https:\/\/papersspot.com\/blog\/wp-json\/wp\/v2\/posts\/78387","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/papersspot.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/papersspot.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/papersspot.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/papersspot.com\/blog\/wp-json\/wp\/v2\/comments?post=78387"}],"version-history":[{"count":0,"href":"https:\/\/papersspot.com\/blog\/wp-json\/wp\/v2\/posts\/78387\/revisions"}],"wp:attachment":[{"href":"https:\/\/papersspot.com\/blog\/wp-json\/wp\/v2\/media?parent=78387"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/papersspot.com\/blog\/wp-json\/wp\/v2\/categories?post=78387"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/papersspot.com\/blog\/wp-json\/wp\/v2\/tags?post=78387"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}