{"id":9570,"date":"2021-07-02T12:40:44","date_gmt":"2021-07-02T12:40:44","guid":{"rendered":"https:\/\/papersspot.com\/blog\/2021\/07\/02\/engineering-question\/"},"modified":"2021-07-02T12:40:44","modified_gmt":"2021-07-02T12:40:44","slug":"engineering-question","status":"publish","type":"post","link":"https:\/\/papersspot.com\/blog\/2021\/07\/02\/engineering-question\/","title":{"rendered":"Engineering Question"},"content":{"rendered":"<p>A contractor anticipates his spending to be as shown in the 10-months project. Owner\u2019s reimbursement lags by a month and owner retains 10% till the final and satisfactory completion of the project. Borrowing money cost the contractor 1% per month. The contractor will add a 5% profit to the total. <br \/>Calculate the cash flow, net cash flow, and cumulative cash flow <br \/>Calculate the cost of borrowing money, maximum debt, and total contract sum <br \/>Draw the cash flow diagrams <\/p>\n<p>Use the calculation sheet as in the Cash-flow Excel file <br \/>Month <br \/>Spending <br \/>1 <br \/>$1,500,000 <br \/>2 <br \/>$1,950,000 <br \/>3 <br \/>$2,600,000 <br \/>4 <br \/>$3,350,000 <br \/>5 <br \/>$3,760,000 <br \/>6 <br \/>$4,200,000 <br \/>7 <br \/>$2,890,000 <br \/>8 <br \/>$2,200,000 <br \/>9 <br \/>$1,670,000 <br \/>10 <br \/>$920,000 <br \/>Total <br \/>$25,040,000 <br \/>Problem 2. Do exercise #21, chapter 8 in the Scheduling book. Use the calculation sheet as in the Cost-Time Excel file. <br \/>Please note that an example is uploaded in module-2 as an excel file named Cash-flow example. <\/p>\n","protected":false},"excerpt":{"rendered":"<p>A contractor anticipates his spending to be as shown in the 10-months project. Owner\u2019s reimbursement lags by a month and owner retains 10% till the final and satisfactory completion of the project. Borrowing money cost the contractor 1% per month. The contractor will add a 5% profit to the total. Calculate the cash flow, net [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[24],"class_list":["post-9570","post","type-post","status-publish","format-standard","hentry","category-research-paper-writing","tag-engineering"],"_links":{"self":[{"href":"https:\/\/papersspot.com\/blog\/wp-json\/wp\/v2\/posts\/9570","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/papersspot.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/papersspot.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/papersspot.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/papersspot.com\/blog\/wp-json\/wp\/v2\/comments?post=9570"}],"version-history":[{"count":0,"href":"https:\/\/papersspot.com\/blog\/wp-json\/wp\/v2\/posts\/9570\/revisions"}],"wp:attachment":[{"href":"https:\/\/papersspot.com\/blog\/wp-json\/wp\/v2\/media?parent=9570"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/papersspot.com\/blog\/wp-json\/wp\/v2\/categories?post=9570"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/papersspot.com\/blog\/wp-json\/wp\/v2\/tags?post=9570"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}