Feasibility Study

I’ve an assignment (Feasibility study) to see if the PV system is economically or not if I have installed it on School/University in the long run. I’ve installed PVsyst in my computer. It is to write a feasibility study report for 6500 words including such as, Net Present Value NPV; Internal rate of return (IRR), Benefit cost ratio (B/C Ratio), Discounted payback period (DPB) and Levelized cost of electricity (LCOE) …etc
The location, area and power consumption.
No plagiarism, no match
Minimum number of 10 references
Fist draft should be sent after 3 days to check the progress